Today was a short day today thankfully. Everyone was pretty beat after the week but pound for pound we've made a lot of progress. Our support steel for the great division has been located and attached to the existing earthquake-resistant armature inside the organ chamber. Chests and racking for the 32' open wood and 32' tuba were installed and the bottom ocatves of those ranks were threaded though the lowercase and hoisted into place. CC of the tuba swung behind the facade casework with at least 2 inches to spare and the color came back into Andrew's face almost immediately!
Dinner was excellent. Tommorrow you will find us at Newport Beach.
|